top of page

City of Visalia Transit Center Expansion

Visalia Transit, East Oak Avenue, Visalia, CA, USA

This expansion of the City’s centrally located and highly visible transit center included 12 bus bays, four pedestrian shelters, two storage buildings, a solar-powered lighting system, a public plaza with decorative paving, tiles and fountain, and decorative reinforced concrete paving on all bus lanes. CMCS was hired to manage completion of the project, which required research and analysis to determine the source of identified construction problems. As a result, all repairs were made as needed, at no additional cost to the City of Visalia. Construction cost: $1.33 million.

Project Overview

Project Gallery

Our Role

Forensic Construction Management

Delivery Method

Project Budget

$1,330,000

Completion Date

August 2009

Project Gallery

unnamed.png

Our Locations

8300 W. Doe Avenue

Visalia, CA 93290

2 Lower Ragsdale, Ste 240

Monterey, CA 93940

Contact Us

Phone: (559) 735-9556

Fax: (559) 735-9529

Phone: (831) 884-5573

Fax: (831) 884-5874

Inquiries

For all inquiries:

info@cmconstructionservices.com

CA License: #821243

bottom of page